Class Members
Hull Number |
Name |
Laid Down |
Commissioned |
Construction Shipyard
|
SV-1 |
UNS El Dorado |
23rd November 2032 |
29th May 2033 |
Vancouver Naval Yard
|
SV-2 |
UNS Klondike |
23rd November 2032 |
29th May 2033 |
Vancouver Naval Yard
|
SV-3 |
UNS Shambhala |
29th May 2033 |
1st September 2033 |
BC Void Shipbuilding
|
SV-4 |
UNS Avalon |
29th May 2033 |
1st September 2033 |
BC Void Shipbuilding
|
SV-5 |
UNS Cibola |
1st September 2033 |
4th December 2033 |
BC Void Shipbuilding
|
SV-6 |
UNS La Canela |
1st September 2033 |
4th December 2033 |
BC Void Shipbuilding
|
Aurora Design
El Dorado class Science Vessel 1,400 tons 126 Crew €306 million TCS 28 TH 80 EM 0
2857 km/s Armour 1-11 Shields 0-0 Sensors 1/1/1/1 Damage Control Rating 1 PPV 0
Maint Life 5.53 Years MSP 137 AFR 15% IFR 0.2% 1YR 8 5YR 113 Max Repair 100 MSP
Pratt & Whitney 40000M-E100 Nuclear Pulse Engine (2) Power 40 Fuel Use 100% Signature 40 Armour 0 Exp 5%
Fuel Capacity 100,000 Litres Range 128.6 billion km (520 days at full power)
Gravitational Survey Sensors (1) 1 Survey Points Per Hour
Geological Survey Sensors (1) 1 Survey Points Per Hour
This design is classed as a Military Vessel for maintenance purposes