El Dorado

From Aurora LP Wiki
Jump to: navigation, search

Class Members

Hull Number Name Laid Down Commissioned Construction Shipyard
SV-1 UNS El Dorado 23rd November 2032 29th May 2033 Vancouver Naval Yard
SV-2 UNS Klondike 23rd November 2032 29th May 2033 Vancouver Naval Yard
SV-3 UNS Shambhala 29th May 2033 1st September 2033 BC Void Shipbuilding
SV-4 UNS Avalon 29th May 2033 1st September 2033 BC Void Shipbuilding
SV-5 UNS Cibola 1st September 2033 4th December 2033 BC Void Shipbuilding
SV-6 UNS La Canela 1st September 2033 4th December 2033 BC Void Shipbuilding

Aurora Design

El Dorado class Science Vessel    1,400 tons     126 Crew     €306 million      TCS 28  TH 80  EM 0
2857 km/s     Armour 1-11     Shields 0-0     Sensors 1/1/1/1     Damage Control Rating 1     PPV 0
Maint Life 5.53 Years     MSP 137    AFR 15%    IFR 0.2%    1YR 8    5YR 113    Max Repair 100 MSP

Pratt & Whitney 40000M-E100 Nuclear Pulse Engine (2)    Power 40    Fuel Use 100%    Signature 40    Armour 0    Exp 5%
Fuel Capacity 100,000 Litres    Range 128.6 billion km   (520 days at full power)

Gravitational Survey Sensors (1)   1 Survey Points Per Hour
Geological Survey Sensors (1)   1 Survey Points Per Hour

This design is classed as a Military Vessel for maintenance purposes